Agile and Resilient Civil Construction Project Scheduling

Authors

  • Samira Abshari Department of Civil Engineering, Iran Industrial Research Non-profit Non-Governmental Higher Education Institute, Qazvin, Iran

DOI:

https://doi.org/10.22034/ijieor.v3i1.132

Keywords:

Agile, Resilient, Civil Construction, Project Scheduling

Abstract

The dynamic nature of civil construction projects demands adaptive scheduling techniques that can accommodate changing conditions, uncertainties, and stakeholder needs. Agile and resilient project scheduling methodologies have emerged as critical approaches for ensuring project success in the face of these challenges. This paper explores the principles, methodologies, and benefits of integrating agile and resilient practices in civil construction scheduling. A comprehensive review of existing literature, combined with case studies and numerical analyses, illustrates how these approaches enhance flexibility, reduce risks, and improve project outcomes. The findings highlight the importance of iterative planning, stakeholder collaboration, and contingency strategies in achieving robust scheduling frameworks. Practical recommendations are provided to guide construction managers in adopting these methodologies effectively.

Downloads

Published

2021-01-29

How to Cite

Abshari, S. (2021). Agile and Resilient Civil Construction Project Scheduling. International Journal of Industrial Engineering and Operational Research, 3(1), 53–65. https://doi.org/10.22034/ijieor.v3i1.132

Issue

Section

Articles